![](http://development.southzeb.eu/wp-content/uploads/2014/07/SouthZEB_bg.jpg)
Ex-Post building
Image Source
General Information:
- Project name: Ex-Post
- Project type: refurbishment
- Building type: Office building
- Building Typology: Non-residential
- Location: Italy, Trentino-Alto Adige/Südtirol Region, Bolzano Province, Bolzano Municipality
- Year of construction: 2004-2006
- Number of floors: 5
Building Size:
- Gross building volume: 13.464 m3
- Gross floor area: 3.960 m2
- Gross heated floor area: 2.857 m2
Building Envelope:
- Exterior wall: 15 mm exterior plaster; 350 mm of EPS insulation; 10 mm cement; 300 mm mansory+concrete; 15 mm Interior plaster; U=0.13 W/(m2K)
- Roof: 250 mm brick ceiling; 140 mm polyconcrete; 50 mm screed; 10 mm tiles; U=0,678 W/(m2K)
- Basement floor / floor slab: 15 mm Interior plaster; 350 mm concrete slab; 50 mm sloped screed; 280 mm thermal insulation XPS; 5 mm PVC sealing; U-value=0,13 W/(m2K)
- Windows and balcony doors: 3-pane windows with plastic frame;, U=0.79 W/(m2K)
Building service systems:
- Ventilation: A central air handling unit with filters and a heat recovery humidifier and cooling machine is installed.
- Heating: A central heating system with a gas-condensing furnace, with a 800 liters buffer tank) which provides warm water to convection heaters.
- Photovoltaic installation: Installed capacity of 27 kW photovoltaic modules on the southeast façade (220 m2).
Building energy performance:
- Annual heating demand: 12 kWh/m2a
- Heating load: 13 W/m2
- Cooling: 4 kWh/m2.a
- Primary energy requirement: 118 kWh /m2a
- Air tightness: n50 = 0.64/h
Links for further information:
- http://www.passivhausprojekte.de/index.php?lang=en#d_2782
- http://www.aidaproject.eu/downloads/25/02_eurac_expost_en.pdf
- http://wiki.cesba.eu/w/images/6/61/CABEE%2C_front_runner%2C_Ex-Post_Building_Bolzano%2C_description.pdf
- http://www.researchgate.net/publication/266331232_Towards_Zero_Energy_Renovation_Ex-Post_Building_in_BolzanoItaly